The Marina Bay Sands Integrated Resort is comprising of a 3-Storey Museum, a 5-Storey Podium Complex Comprising of Mice, Casino, Theatre, Retail and Basement Carpark; and 3 Blocks of 57-Storey and 5 Basement Carpark. It is to Design of temporary earth retaining system for 5 basement excavations. Geotechnical consultation and site supervision during basement excavations Geotechnical instrumentation and interpretation.
Service:
Civil / Structural Engineering Design
Geotechnical Engineering Design